Bargello Table Runner #2

I’ve been working on a second bargello table runner for a class I held last week (we’re supposed to meet again in a week and a half – not sure if the gals will come or not – not sure if the shop will even be open!) The government directives to “stay at home” may prevail and even this small group may not take place. If that should happen I may try a Google “Hang-Out” with the gals – (that’s if I can get it to work and write them some instructions for connecting) so we might talk about assembling their table runners. [PS: Everything has closed down here in NS – shop closed; classes cancelled… (Mar 19 2020)]

My fabric for this runner came from a 5″ wide 20 strip jelly roll with a lovely range of contrasting colours. I selected 10, deciding to use the bronze as the contrast fabric and situated it between two of the black/bronze strips. 5″ allowed me to cut 2 x 2 1/2″ set – precisely what I needed for 4 bargello blocks.

Bargello Table Runner II – Under Construction

Notice I said 2 1/2″ strips. The previous bargello table runner used 2″ strips. Using 2 1/2″ strips makes each block quite a bit taller – so much so that placed together end to end (as above) my table runner would turn out to be somewhere around 75″ long; too long for my table; too long to hang on my front door.

So, I’ve decided to join the blocks on the sides using a 1 1/2″ strip which allows me to generate a flowing wave pattern. The other thing I did was to use several narrower strips at the centre of the block which produced a more bargello-like curve to the layout (more obvious in the top image).

Three blocks laid out as a “wave”

I haven’t sewn all three blocks together yet – I want to be able to show the gals different ways of thinking about layout. So tomorrow I’ll assemble the 4th block (which is cut and laid out) and ready to go.

I should end by saying to anyone reading this “Stay safe.” Stay well!” I am staying at home for the most part – I went to pick up a prescription this afternoon. I tried to see my dentist (I just lost a small filling while eating lunch) but the office is only taking emergencies. My small filling doesn’t count – so heaven knows when I might be able to get it repaired. Months maybe?

I’m so grateful to have the sewing and knitting to keep my mind and hands busy. I’ve a lot of projects, including a spring jacket, I want to work on during the next while.

One thought on “Bargello Table Runner #2

  1. Pingback: Bargello Table Runner #2 – Finished | jmn

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.